Trail work, pinned to the mile.

Every blowdown, washout and loose water bar becomes a work order on the trail map, logged by your crew from the field with no signal needed.

  • Works offline past the trailhead
  • Free for crews of five or fewer
A dirt trail switching back up a forested hillside past a log water bar
Ridge Loop Trail 7.8 mi · 4 work orders

Mile 4.2 cleared 11:40 AM MT

Work orders

Ridge Loop · this week

Crew B
0.6 Tread repair
2.1 Water bar
4.2 Blowdown
6.3 Sign post
Synced at the trailhead 3 of 4 cleared

Trail crews in 23 state park systems plan their season in Switchback

  • Caddo Bluffs
  • Tall Aster Parks
  • Greyrock Trails
  • Ochre Fork
  • Quillback
  • Lantern Creek

Planning

The whole trail system, one backlog

Reports from rangers, volunteers and hikers land on the map at the mile they came from. Supervisors sort by severity and hand each crew a week that makes sense on foot.

Ridge Loop Trail Mi 0.0 – 7.8

Mi 2.1 · Water bar Mi 4.2 · Blowdown Mi 6.3 · Sign post Trailhead Summit spur
  • Cleared 3.1 mi
  • Scheduled 2.3 mi
  • Open 2.4 mi
Every report on the map
Hiker reports, ranger notes and crew findings drop onto the trail at their mile, colored by what is cleared, scheduled or still open.

Waiting to sync

3
  • Mi 2.1 · Water bar reset
  • Mi 2.9 · Drainage dip cleaned
  • Mi 3.4 · 2 photos attached

Sends at the trailhead

Offline first, always
Logs wait on the phone and send themselves when a bar of signal returns.

Open orders by month

Down 71% since May

  • 62 May
  • 51 Jun
  • 43 Jul
  • 29 Aug
  • 18 Sep
A backlog you can shrink
Open orders by month and by trail, so the budget meeting sees what one more crew would clear.
A trail crew lead in a hard hat checks her phone beside a freshly cut fallen tree

Field log

Mile 4.2

Blowdown, 18 in. red oak. Bucked and cleared off the tread.

Crosscut saw · 2 crew 1.5 crew hours

Synced 11:42 AM MT

Logged where the work happens

Crews close a work order with a photo, the tools used and crew hours before they walk to the next mile. Switchback keeps it on the phone and sends it when a bar of signal comes back.

Offline by default
Maps, orders and forms download with the week’s plan, so a dead zone never stops a log.
Photos pinned to the mile
Before and after shots attach to the order and its mile, not somebody’s camera roll.
Hours that add up
Crew and volunteer hours roll into the grant report without a spreadsheet.
Tour the field app

From a hiker’s report to cleared tread

Three steps, and the first one takes an afternoon. No GIS team, no new radios.

  1. 01

    Bring in your trails

    Upload a GPX file or trace the route, and Switchback sets a mile marker every tenth of a mile.

    About 20 minutes a trail

  2. 02

    Plan the week on the map

    Drag open orders into a crew’s week. They group by trailhead, so nobody hikes the same mile twice.

    Mondays at 7:00 AM

  3. 03

    Close it from the trail

    The crew logs the fix with a photo and hours. The order clears and the backlog updates for everyone.

    Synced at the trailhead

Season to date · through Sep 12, 2026

What a season on Switchback adds up to

2,318 mi
of state park trail mapped by mile marker
11 days
median from a hiker’s report to a cleared blowdown
94%
of work orders closed from the trail, not the office
6,470
volunteer hours logged straight into grant reports

Crews who put the whiteboard away

Supervisors, crew leads and volunteer coordinators on what changed in their first season.

We used to hear about a washout from a hiker’s post online. Now it’s on the map at mile 3.1 before lunch, and a crew has it on Thursday’s list.

Jordan Kessling

District Trails Supervisor, Caddo Bluffs State Park

Volunteers log their hours on their own phones now. The grant report took an afternoon instead of two weeks.

Casey Morrow

Volunteer Coordinator, Greyrock Trails

No signal past the second switchback, and it doesn’t matter. Everything we logged was waiting when we got back to the truck.

Riley Abernathy

Trail Crew Lead, Ochre Fork State Park

Questions crews ask before the season

Something else? Write to us and a person who has swung a pulaski answers.

crews@switchback.app
Does it really work with no cell signal?

Yes. The week’s trails, orders and forms download to each phone before the crew leaves. Logs queue on the device and send the next time it finds a signal.

Can volunteers use it without a paid seat?

Volunteers join with a free field login that logs hours and photos on the orders they are assigned. They can’t edit the plan or see other districts.

How do we get our trails in?

Upload GPX or KML files, or trace a route over satellite imagery. Mile markers land every tenth of a mile and can be nudged to match the posts on the ground.

Will it export for grant reporting?

Crew and volunteer hours export by trail, date and funding source as a CSV. A one-page season summary for grant applications is one click.

What does it cost for a state park system?

Pricing is per district, starting at $1,480 a year with unlimited field logins. Most systems start with one district for a season.

Is our data ours?

Every trail, order and photo exports at any time. When a contract ends we hand over the full archive and delete our copy within 30 days.

Forested ridgelines fading into morning haze, with a trail along the nearest ridge

Clear the spring backlog before Memorial Day

Bring one district’s trails in this week. Your crews log their first work order from the field on Monday.